Net present value vs internal rate of return

Net present value vs internal rate of return

Independent vs dependent projects

NPV and IRR methods are closely related because:

i) both are time-adjusted measures of profitability, and
ii) their mathematical formulas are almost identical.


So, which method leads to an optimal decision: IRR or NPV?

a) NPV vs IRR: Independent projects

Independent project: Selecting one project does not preclude the choosing of the other.

With conventional cash flows (-|+|+) no conflict in decision arises; in this case both NPV and IRR lead to the same accept/reject decisions.

Figure 6.1 NPV vs IRR Independent projects

If cash flows are discounted at k1, NPV is positive and IRR > k1: accept project.

If cash flows are discounted at k2, NPV is negative and IRR < k2: reject the project.

Mathematical proof: for a project to be acceptable, the NPV must be positive, i.e.



Similarly for the same project to be acceptable:

where R is the IRR.

Since the numerators Ct are identical and positive in both instances:

· implicitly/intuitively R must be greater than k (R > k);
· If NPV = 0 then R = k: the company is indifferent to such a project;
· Hence, IRR and NPV lead to the same decision in this case.


b) NPV vs IRR: Dependent projects

NPV clashes with IRR where mutually exclusive projects exist.

Example:

Agritex is considering building either a one-storey (Project A) or five-storey (Project B) block of offices on a prime site. The following information is available:

Initial Investment Outlay

Net Inflow at the Year End

Project A

-9,500

11,500

Project B

-15,000

18,000

Assume k = 10%, which project should Agritex undertake?

$954.55

$1,363.64


Both projects are of one-year duration:

IRRA: 

$11,500 = $9,500 (1 +RA)

= 1.21-1

therefore IRRA = 21%

IRRB: 

$18,000 = $15,000(1 + RB)

= 1.2-1

therefore IRRB = 20%


Decision:

Assuming that k = 10%, both projects are acceptable because:

NPVA and NPVB are both positive
IRRA > k AND IRRB > k


Which project is a "better option" for Agritex?

If we use the NPV method:

NPVB ($1,363.64) > NPVA ($954.55): Agritex should choose Project B.


If we use the IRR method:

IRRA (21%) > IRRB (20%): Agritex should choose Project A. See figure 6.2.


Figure 6.2 NPV vs IRR: Dependent projects

Up to a discount rate of ko: project B is superior to project A, therefore project B is preferred to project A.

Beyond the point ko: project A is superior to project B, therefore project A is preferred to project B

The two methods do not rank the projects the same.